IND.04 · Manufacturing and supply chain

The estate is the factory floor.

Manufacturers are digitising production while running equipment that cannot be patched and suppliers who cannot be audited. Ransomware against a single scheduling system can stop a line, which changes the risk calculus from data loss to revenue per hour.

01

What presses on you

Production uptime versus patching

A maintenance window that stops a line has a cost, so vulnerabilities persist with compensating controls that are rarely tested.

Supplier concentration

A tier-two supplier with weak controls can become the route into a tier-one manufacturer.

Vision and quality data

Camera and sensor data is valuable for AI and sensitive commercially, which complicates cloud deployment.

02

What we do about it

Segmentation with a migration path

Zones that protect the line without requiring an outage, sequenced by what removes the most risk per maintenance hour.

Vision with measured accuracy

Inspection systems evaluated against a documented baseline and monitored for drift, with uncertain cases routed to a person.

Supplier risk that is proportionate

Tiering by operational dependency rather than by spend, with contractual controls that match the tier.

The question we would start with

Which single supplier failure stops your line within a day?

If you cannot answer it today, that is the first engagement, not a failure.

03

Where to start

  • →

    Computer vision & predictive analytics

    Vision inspection and forecasting models for operational decisions, measured against a stated baseline.

  • →

    Hardening & Zero Trust

    Infrastructure hardening and Zero Trust architecture delivered as a sequenced programme, not a slide deck.

  • →

    Security operations & response

    Detection engineering, monitoring design, incident response readiness and rehearsed playbooks built around your actual estate.

  • →

    Business process automation

    Workflow automation that handles exceptions, with AI where it adds value and deterministic code where it does not.

Next step

Bring the constraint, not the brief.

Tell us what you cannot change: the regulator, the legacy system, the board, the supplier contract. That is where the design starts.

Request a callback →