Enterprise AI · 07
Measure what nobody has time to look at.
Vision systems and forecasting models for physical and operational decisions: inspection, counting, anomaly detection, demand and capacity planning, with accuracy stated against a defined baseline.
The situation
Vision projects fail on data collection, not modelling. The camera angle is wrong, lighting changes between shifts, defects are rare so the dataset is imbalanced, and nobody labelled the examples needed to prove the system works.
Forecasting projects fail on decision fit. A model with good average error is useless if it is wrong precisely when inventory decisions are made. The right question is not "how accurate is the forecast" but "does this change the decision and the cost".
Both domains reward an unglamorous sequence: define the decision, instrument the data, establish a baseline, then model. Skipping the baseline makes it impossible to know whether the system helped.
What we do
- 01
Start from the decision the output will change, and the cost of a false positive against a false negative.
- 02
Design data capture deliberately: sensor placement, lighting, labelling protocol, and enough examples of the rare cases that matter.
- 03
Establish a human or existing-system baseline before modelling, so improvement is measurable.
- 04
Choose the simplest approach that meets the requirement, from classical vision to fine-tuned models, and justify the choice.
- 05
Deploy at the edge or in the cloud according to latency and privacy constraints, with monitoring for distribution shift.
What you get
-
Decision and data specification
The decision, error costs, capture requirements, labelling protocol and acceptance criteria.
-
Dataset and baseline
A curated, labelled dataset with documented provenance, plus measured performance of the current process.
-
Trained model and evaluation
Model with per-class performance, confusion analysis and a stated operating threshold with its trade-offs.
-
Deployment
Inference service or edge deployment matched to latency, bandwidth and data-residency requirements.
-
Monitoring for drift
Detection of input distribution change, performance decay alerts and a retraining procedure.
-
Operational integration
How results reach the people or systems that act on them, including review for uncertain cases.
How we work
- Stage 01
Frame
Define the decision, the error economics and the acceptance threshold with the operational owner.
- Stage 02
Collect and baseline
Instrument capture, label a representative set, and measure how the process performs today.
- Stage 03
Model and validate
Train, evaluate on held-out data, and test under real operating conditions rather than a curated set.
- Stage 04
Deploy and monitor
Roll out with a review period, then monitor drift and retrain on a defined cadence.
How we measure success
Agreed before work starts, reported against a stated baseline. Where a number depends on your data, we will tell you what we cannot promise.
- 01 Recall and precision at the chosen operating threshold
- 02 Escape rate: defects or errors reaching the customer
- 03 Forecast error against the decision cost, not the average
- 04 Model performance stability month over month
Where we stop
Scope discipline is the product. These are the limits we hold to, in writing, before any work begins.
- We will not promise accuracy before seeing your data. Commitments are made against a measured baseline.
- Rare-event detection requires sufficient examples. If the data does not exist, we will scope a collection period rather than overfit a small set.
- Cameras, sensors and edge hardware are procured separately; we specify requirements and integrate.
Questions we are asked
- How much data do we need?
- It depends on the variability of the task and how rare the events are. We start with a data audit and specify a collection plan, rather than quoting a number that would be misleading.
- Can the model run on-premise at the edge?
- Yes. We optimise and quantise models for edge hardware where latency or data residency requires it, and we are explicit about the accuracy and cost trade-offs.
- Do you handle the camera and lighting setup?
- We specify the requirements and work with your facilities or integrator. We do not install physical infrastructure ourselves, and we will tell you when the capture setup is the limiting factor.
What changes
Three things that are different afterwards.
Consistent inspection
Every unit checked to the same standard, with human attention reserved for uncertain cases.
Decisions with lead time
Forecasts arrive early enough to change a purchasing or staffing decision.
Measurement you can defend
Performance stated against a documented baseline and monitored over time.