Approach
The measurement is the method.
Every engagement follows the same five phases, whether it is an authorized attack simulation or a production AI system. The phases exist so that improvement can be demonstrated rather than asserted.
- 01
Scope
Week 0–1
We agree what decision this work must inform, which systems are in scope, who authorizes what, and what would make us stop. Scope is written, not implied, and it includes the things you are not asking us to look at.
- Written scope and rules of engagement
- Named owners on both sides
- Success criteria and stop conditions
- 02
Measure
Week 1–3
We establish the current state with evidence rather than assertion. Existing documentation is treated as a hypothesis. Where we cannot measure something, it is labelled as an assumption rather than presented as fact.
- Baseline with method stated
- Evidence pack and reproduction steps
- Assumption register
- 03
Change
Week 3–8
We do the engineering, in your repositories and your cloud account, sequenced by risk reduced per unit of effort. Where a fix requires an architectural decision, we bring the options and the trade-offs rather than a preference.
- Implemented changes with review
- Rollback plan per change
- Weekly written progress
- 04
Verify
Week 8–10
We attempt the original path again. Verification is the deliverable; a report is a by-product. Where something did not work, that appears in the final document with the same prominence as what did.
- Re-test evidence
- Residual risk statement, including accepted risk
- Updated runbooks
- 05
Handover
Final week
Your team takes ownership with the instrumentation to keep it honest: tests, monitors, policy checks and documentation. If you would rather we stayed, that is a separate decision with a separate price.
- Ownership transfer session
- Tests and monitors wired into your pipeline
- Named contact for thirty days
01 / Rules
Four rules that bind us when they are inconvenient.
These are not values statements. They are operating constraints that appear in every engagement letter, including the parts about stopping.
Authorization before action
No offensive testing, scanning or emulation without a signed authorization from the system owner, a target list and a stop condition. This is not negotiable and not waivable by urgency.
Data minimisation
We take the minimum data required, store it encrypted, and delete it on an agreed schedule. Client data is never used to train models, demonstrate capability or populate a case study.
One accountable principal
Every engagement has a named principal who scopes it, does the work and signs the deliverable. Substitution after signature is a breach of the engagement, not a resourcing decision.
Written or it did not happen
Decisions, risks, accepted exceptions and scope changes are recorded in writing within one business day. Verbal agreements are treated as proposals until they are written down.
02 / Failure modes
Six ways consulting goes wrong. We designed against each.
Most of these are commercial incentives rather than incompetence. Naming them is the cheapest way to keep them out of an engagement.
The report and run
A document arrives, the findings are confronting, and nobody is available to help fix them. We include a remediation window and a re-test in the scope.
The permanent pilot
Work continues indefinitely because nobody defined what done looks like. Every engagement has acceptance criteria and an end date.
The junior substitution
The people who pitched are not the people who deliver. We name the principals in the scope document and hold to it.
The scope creep
Small additions accumulate until the original problem is forgotten. Additional work is a new written scope, with its own price and date.
The theatre metric
Numbers that look impressive and change no decision. We define the metric before the work and report it even when it is unflattering.
The dependency
A deliverable that only the consultant can operate. Handover, tests and runbooks are in scope, not an upsell.
03 / Engagements
Four shapes, all with an end.
The shape follows the problem. If none of these fit, say so and we will either design something specific or tell you we are not the right firm.
Advisory
Monthly retainerFractional security or AI leadership alongside your team. Architecture reviews, board reporting, hiring support and the difficult calls that need an experienced second opinion.
Organisations with a team but no senior owner for the discipline.
Project
3–16 weeksA defined outcome with a fixed scope, a written plan and acceptance criteria. Assessment, build or remediation, delivered to a date.
A specific decision, exposure or system that needs to be resolved.
Embedded
One to two quartersZeests engineers working inside your delivery teams, in your repositories and rituals, building capability that stays after we leave.
Programmes that need additional senior capacity to hold a date.
Managed
12 months, renewableOngoing operation of a capability we built together: detection engineering, model evaluation, or platform reliability, with agreed service levels.
Capabilities that must keep working after the project ends.
If the method sounds slower than you need, it usually saves a repeat engagement.