IND.03 · Critical infrastructure and energy
Availability is a safety property.
Operational technology runs on assumptions that predate the current threat model: flat networks, long asset lifetimes and vendors who remote in with permanent access. The security question is not whether data is lost but whether the plant keeps running.
What presses on you
Converged IT and OT estates
Business systems and control networks share identity and remote access paths that were never designed for that coupling.
Vendor remote access
Third-party maintenance accounts are frequently standing, shared and outside the visibility of the security team.
Regulatory scrutiny after the fact
Incident reporting obligations are short and the evidence required is detailed, which requires preparation rather than improvisation.
What we do about it
Least access for vendors
Time-bound, session-recorded remote access with approval, replacing permanent accounts.
Detection where the plant lives
Parsing and monitoring for industrial protocols, with behaviours mapped to physical consequence.
Rehearsed shutdown decisions
Tabletop exercises with plant managers, defining who decides and on what evidence.
The question we would start with
If a vendor account were compromised tonight, what would stop it reaching the control network?
If you cannot answer it today, that is the first engagement, not a failure.
Where to start
- →
Security operations & response
Detection engineering, monitoring design, incident response readiness and rehearsed playbooks built around your actual estate.
- →
Hardening & Zero Trust
Infrastructure hardening and Zero Trust architecture delivered as a sequenced programme, not a slide deck.
- →
Penetration testing & red teaming
Objective-led penetration tests and red team operations under written scope, rules of engagement and defined success criteria.
- →
Governance, risk & resilience
Risk registers, control mapping, third-party risk and business continuity that leadership can act on.
Next step
Bring the constraint, not the brief.
Tell us what you cannot change: the regulator, the legacy system, the board, the supplier contract. That is where the design starts.
Request a callback →